This is an illustrative concept, not a completed client project or an actual product for sale.

The challenge
This scenario assumes manual operation across instruments and results stored in separate files.
Proposed approach
Connect condition setup, connection checks, sequence execution, measurement, evaluation and reporting. Record interruptions and retest history within the same trace.
Potential deliverables
- Test operation and sequence management interfaces
- Device communication modules and data schema
- Reports and operational documentation
